8/23/2009 8/24/2009 8/27/2009 9/1/2009 9/2/2009 9/9/2009 9/12/2009 9/24/2009 9/29/2009 10/1/2009 10/7/2009 10/14/2009 11/30/2009

8/23/2009 - Site for the shop. Site was cleared about two years ago.

Pump house with above ground water tank (1550 gallons). Part of the main trench to the shop.