The Construction
Quick Links
8/23/2009
8/24/2009
8/27/2009
9/1/2009
9/2/2009
9/9/2009
9/12/2009
9/24/2009
9/29/2009
10/1/2009
10/7/2009
10/14/2009
11/30/2009
>8/27/2009 - Installed the 3" and two 1" conduits from the power pole to the
meter box. Also back filled the trench a bit for the neighbors to have their
driveways back. :)
Return to the Captain's Office