The Construction


Quick Links
8/23/2009 8/24/2009 8/27/2009 9/1/2009 9/2/2009 9/9/2009 9/12/2009 9/24/2009 9/29/2009 10/1/2009 10/7/2009 10/14/2009 11/30/2009

8/24/2009 - Dug the trench for the power from the power pole to the meter box. The neighbors were gracious enough to let us annihalate their nice drive way. Not sure I would have let new neighbors I barely knew dig up my front yard, but well they did (You can't even see the sides of the road in the picture we made such a mess :).

400 AMP Meter/breaker panel hung with 200 AMP load center on the right (for running to the property's two water pumps).


Return to the Captain's Office